Project overview
The Dawukou application record covers lighting work in the turbine and boiler areas of generating units 1 and 2. The selected photographs show the turbine-hall interior.
Areas documented
- Turbine-hall roof: The register identifies ZY9710-L200 for high-level lighting.
- Zero-metre passage: ZY8607-L60 is recorded for corridor lighting.
- Boiler walkway: ZY8607-L30 is recorded at the 12.6-metre level.
Models recorded in the archive
ZY9710-L200; ZY8607-L60; ZY8607-L30.
These are historical model references from the project records, not a current product specification or confirmation of certification scope.
Planning a similar installation
This record illustrates why a thermal-power proposal needs separate schedules for the hall, lower passage and elevated walkway. The listed levels are archive descriptions, not recommended mounting heights for other projects.
For an enquiry, provide the site layout, operating conditions, mounting positions and required documentation. Discuss your project with TORMIN.


