Project overview
The May 2016 Qinghe site record follows lighting through plant buildings and their access areas. The selected photographs show the installed setting rather than a staged product display.
Areas documented
- Plant exterior: The archive records the surrounding building and equipment structure.
- Interior access: Additional photographs show lighting along indoor routes and around plant services.
Models recorded in the archive
ZY8600.
These are historical model references from the project records, not a current product specification or confirmation of certification scope.
Planning a similar installation
For replacement work, record the existing mounting points and the tasks carried out beneath them. A site survey should establish which areas require general illumination and which need local task lighting.
For an enquiry, provide the site layout, operating conditions, mounting positions and required documentation. Discuss your project with TORMIN.




