Daqing Refining & Chemical: Process-Area Lighting

The Daqing Refining & Chemical archive records lighting for a diesel hydrotreating project and a propylene project. This expanded record brings together the existing company case and additional photographs of process structures, equipment platforms and access routes.

Type
Project Case
Location
Daqing, China
Industry
Petrochemical & Chemical
Daqing Refining & Chemical: Process-Area Lighting — site photograph 1

Project overview

The Daqing Refining & Chemical archive records lighting for a diesel hydrotreating project and a propylene project. This expanded record brings together the existing company case and additional photographs of process structures, equipment platforms and access routes.

Areas documented

  • Diesel hydrotreating: The application register identifies BC9302 around air-cooler perimeter walkways and process platforms.
  • Propylene project: BC9303 is recorded for process valves and access walkways.
  • Multi-level structures: The photographs show lights beside stairs, handrails, vessels and pipework.
  • Plant overview: Wider images place individual fixture positions within the process installation.

Models recorded in the archive

BC9302; BC9303.

These are historical model references from the project records, not a current product specification or confirmation of certification scope.

Planning a similar installation

For a similar refinery installation, prepare an area-by-area schedule of inspection points, access platforms and classified locations. The historical model references describe these records; they do not establish a current certificate scope or measured lighting result.

For an enquiry, provide the site layout, operating conditions, mounting positions and required documentation. Discuss your project with TORMIN.

Adapted from the TORMIN company archive. View original source

Model numbers, quantities and performance results are included only when the source documents them.

Need the right industrial lighting specification?

Send the hazardous area, mounting height, target illuminance and project schedule. Our team will help confirm the fit.

Ask a TORMIN Engineer

Tell us what you need.

Fields marked * are required.

Your details will be used to respond to this enquiry.

Choose your language

Currently available in English. More languages coming soon.

Search TORMIN products

Search is coming soon.